Projects
Electricity and instrumentation
Société d’Énergie de la Baie-James
HYDROELECTRIC POWER STATION (480 MW)
Electrical and mechanical installations
Eastmain-1, Quebec
2004 – 2006
Design, labor, supervision, supply of equipment, as part of electrical and mechanical contracts for the construction of the new Eastmain-1 hydroelectric power station. The station has three units that generate a total capacity of 480 MW (work performed in association with HMI Construction Inc.).