Projects
Electricity and instrumentation
-
Les Diamants Stornoway
MINING AND METALLURGY
2015-2016
Power plant piping, mechanical, electrical and instrumentation installation. A seven-generator unit, including gas pipes, glycol and tanks, pumps, compressors and heat exchangers. The electrical panel and instrumentation; equipment, electrical room wiring, main and oil stations, interior and exterior.
-
Goldcorp – Eleonore Project
Mining, metallurgy, Industrial piping and electricity
2013-2014
Installation of piping and mechanical equipment for the concentrator, paste backfill plant and primary and secondary crushers (ball mill, conveyors, tanks, thickeners, pumps).
-
Detour Gold
Mining, metallurgy, Industrial piping and electricity
2011-2012
Installation of piping, electrical and instrumentation equipment for the ore processing plant, including commissioning and operating areas (ball mill, cyclones, tanks, chemical treatment, carbon regeneration kiln and refinery); installation and maintenance of power lines and substations.
Furthermore, we completed the electrical power installation, including the electrical rooms.
-
Québec Lithium
MINING AND METALLURGY
2012
Electrical, mechanical piping and boiler-making installation for an ore processing plant to produce Lithium. The work done includes power electricity for the mill and crusher, installation of crushing equipment (jaw crusher, cone crusher, conveyors, screens, transfer chutes, etc.), installation of a dust collection system and process/hydraulic piping.
-
Osisko - Canadian Malartic
MINING AND METALLURGY
2010
Electrical, mechanical and piping equipment installation for the concentrator. Secondary structural work, installation of electrical components and instrumentation and construction of 120 kV electrical substations.
-
Casa Berardi
MINING AND METALLURGY
2009
Supply of qualified electrical manpower for the reopening of the Casa Bérardi site and its daily operations thereafter.